Login

Reload

Remember me Forgot it?

Not a subscriber?

Click on the button below to create your account and get immediate access to Xinhua Silk Road Database.

Start a Free Trial

Subscribe

Belt & Road Weekly Subscription Form

Research Report

The full edition of the report is available at Xinhua Silk Road Database. You can click the “Table of Content” to have a general understanding of it.

Click on the button below to create your account and get immediate access to thousands of articles.

Start a Free Trial

projects

HOME > China Project


China-Laos railway completes first continuous beam block construction on Mekong River

September 25, 2018


Abstract : The concrete casting for the first block of the Luang Prabang cross-Mekong River super major bridge' continuous beam along the China-Laos Railway was completed on Sept. 17.

137486428_15376157988651n

137486428_15376157988651n

LUANG PRABANG, Laos, Sept. 25 (Xinhua) -- The concrete casting for the first block of the Luang Prabang cross-Mekong River super major bridge' continuous beam along the China-Laos Railway was completed on Sept. 17, the Chinese contractor told Xinhua on Saturday.

Yan Haiyong, CPC party secretary of the China Railway No.8 Engineering Group (CREC-8)'s railway project department, who is in charge of the construction of the two bridges across the Mekong along the China-Laos Railway, said that the Luang Prabang railway bridge with a total length of 1458.9 meters, is a key project of the China-Laos Railway.

According to Yan, the bridge's continuous beam design has high technical standards and is difficult to construct with pier-side bracket. The first block of the continuous beam has a length of 12 meters and consumes a concrete volume of 266 cubic meters.

The China-Laos Railway starts from the border between China and Laos in northern Laos and ends in Vientiane, the capital of Laos. It is the first overseas railway project to be invested, constructed and operated jointly by the Chinese side and directly connected to the Chinese railway network.

The China-Laos Railway is 414 km long, of which the bridge is about 62 km long and the tunnel is about 198 km long.

The China-Lao Railway adopts Chinese technical standards and uses Chinese equipment. It started construction in December 2016. It is scheduled to be completed and open to traffic in December 2021.

The project is designed, constructed and operated in accordance with Chinese railway standards and has a design operating speed of 160 km per hour.


Related Coverage

Focus

Think Tank

  • Foreign firms still betting on China

    October 19, 2018

    With the proactive opening-up of its market and constant improvement of its ...

  • Dollar bonds show confidence in Chinese economy

    October 18, 2018

    The dollar bond sale indicates that there is optimism about the continued im...

  • As US closes up, EU and China must build closer ties

    October 17, 2018

    The EU and China have the world's most dynamic economic relationship, their ...

  • The Chinese Race to Artificial Intelligence

    August 10, 2018

    China is no longer just a manufacturing power, but a technologically advance...

  • Ask Us A Question

    If you have any questions, please enter them in the box below.

    Reload

    Write to Us

    Do you want to be a contributor to Xinhua Silk Road and tell us your Belt & Road story? Send your articles to silkroadweekly@xinhua.org and share your stories with more people.

    Click on the button below to create your account and get imhttp://img.silkroad.news.cn/templates/silkroad/en2017te access to thousands of articles.

    Start a Free Trial